Italy Orders Third Logistic Support Ship From Fincantieri and Leonardo for About $548 Million
OCCAR signed a contract amendment with a Fincantieri-led group for a third logistic support ship for the Italian Navy, due by 2030.
The European defense procurement agency OCCAR has ordered a third logistic support ship for the Italian Navy from a group led by Fincantieri, with Leonardo as a partner. The contract amendment is worth about $548 million (500 million euros), including about $96 million (88 million euros) in options. Fincantieri announced the deal on November 26.
Fincantieri’s share is about $454 million (414 million euros), of which about $41 million (37.5 million euros) is subject to options. Leonardo’s share is about $93 million (85 million euros), including about $55 million (50 million euros) in options. OCCAR Director Joachim Sucker and Eugenio Santagata, head of Fincantieri’s naval vessels division, signed the amendment at the Muggiano shipyard. The ship will be built entirely at Fincantieri’s yard in Castellammare di Stabia near Naples and is due for delivery by 2030.
A logistic support ship keeps a naval task group at sea. It carries fuel, fresh water and cargo and transfers them to other ships while under way. The third ship will be about 193 meters long and 24 meters wide, displace about 27,500 tons and reach about 20 knots, Fincantieri said.
It will not be a straight copy of its sisters. It gets the new SADOC5 combat management system, stronger network protection at a higher security classification and more satellite communications capacity, which requires changes to the ship’s structure. Fincantieri NexTech will supply automation and cybersecurity systems, and Fincantieri’s mechanical systems unit will provide shaft lines, steering gear, bow thrusters and stabilizing fins.
“This new order confirms the strength of the growth trajectory we have outlined for our Defense business,” Fincantieri chief executive Pierroberto Folgiero said.
Third Ship in the Vulcano Class
The new ship joins Vulcano and Atlante, the first two units of the class, which Fincantieri delivered in March 2021 and December 2025. Both were built under Italy’s multi-year Naval Law program to renew the fleet. Atlante was launched at Castellammare di Stabia in May 2024.
The Vulcano-class ships use hybrid electric and diesel propulsion and can stay at sea for up to 30 days. They also carry a hospital rated by NATO as a Role 2 light maneuver medical unit, and Italy has said they can support civil protection, humanitarian and disaster relief work.
The design has an export customer. The French Navy picked a ship derived from the Italian LSS for its FLOTLOG fleet logistics program, and Castellammare di Stabia takes part in building those units.
Construction of the third Italian ship now begins at Castellammare di Stabia, with handover to the navy planned by 2030.